Roadway Repair Machine-manufacture,factory,supplier from China

(Total 24 Products for Roadway Repair Machine)
Roadway Repair Machine:The multifunctional roadway repair machine for coal mines is an effcient mechanized equipment for repairing deformed roadway. The machine breaks the rock by hydraulic quartering hammer, and then shovels the rock by track propulsion and scrapes the stone into its own scraper conveyor by bucket. The conveyor unloads the material into the tramcar, auto-dumper or other transfer equipment from the unloading end, and then supports the roadway by rock bolt and anchor cable through the bolt machine assembly, thus completing the expansion and support of the roadway.
اتصل الآن
Integral Roadway Vehicle Technical Parameters:S/NItemTechnical indicator1Rated capacity (kg)30002Complete vehicle kerb mass (kg)65003Overall dimensions of complete vehicle (mm)4880 x 1600 x18504Minimum   ground   clearance(mm)1705Turning radius (m)3.56Maximum  speed  (km/h)147Maximum gradeability (°)14.58Rated power/rotation speed (kW/rpm)65/2200Integral Roadway Vehicle Technical Features:1. The vehicle is suita
اتصل الآن
SHACMAN Shaanxi Automobile Delong Air Drying Machine DZ9L149360133 Drying Machine Assembly F3000X5000H3000 Patrs
اتصل الآن
Articulated Roadway Vehicle Technical Parameters:S/NItemTechnical indicator1Rated capacity (kg)30002Complete vehicle kerb mass (kg)62003Overall dimensions of complete vehicle(mm)4850x1600 x20004Minimum  ground  clearance  (mm)2005Minimum turning radius (m)(outer)4.76Maximum  speed  (km/h)207Maximum gradeability (°)148Rated power/rotation speed (kW/rpm)65/2200The vehicle is mainly used for the rapid transportation of bolts, anchor cables
اتصل الآن
EBZ260W small section rock roadway road header,designed with a weight of 82.5 t and a cutting power of 260kW, is suitable for total rock roadway tunneling of 10-20 m2 sections with a hardness f≦8 (local f ≦10).It is a heavy-duty road header with strong cutting ability,high reliability and advanced technology.Technical features1.Compared with the same type of heavy-duty rock roadway road header, it hasa strong cutting ability and a low machine body height, and can better adapt tototal rock roadway tunneling of small sections with f≤8;2.
اتصل الآن
VFP-G SERIES LARGE TORQUE,MULTI STATION PRECISION  HEAVY WARM FORGING MACHINE (SECONDARY DRIVE)Technical parameter Unit VFP-600GVFP-800GVFP-1000GAbilityTons 6008001000 Slider strokemm175200250Slide Adjustmentmm 101010Number of trips Spm656060Maximum clamping heightmm555695755Slider bottom panelmm755×640780×700920×800Table panelmm950×7701010×9001120×980Main motorKw×p45×655×675×6VFP-1300GVFP-1600GVFP-2000GVFP-2500GVFP-3150GVFP-4000G130016002000250031504000250300300350350350151515151515605555555555845 9151000105011001150980×8601100×10001250×11001350×11
اتصل الآن
VFP SERIES HIGH-SPEED MULTI STATION PRECISION HEAVY  WARM FORGING MACHINE (PRIMARY DRIVE)Technical parameterUnitVFP-600VFP-600WVFP-800VFP-800WVFP-1000VFP-1000WabilityTons60060080080010001000Slider strokemm175200200250250250Slide Adjustmentmm101010101012Number of tripsSpm1009595858585Number of effective working tripsSpm181818161616Maximum clamping heightmm555555695695755755Capability occurrence pointmm555555Slider bottom areamm755×640780×700780×700920×800920×800980×860Table panel areamm950×7701010×9001010×9001120×9801120×9801190×1050Main motorKw×p37kw×8p37kw×8p45kw×8p45kw×8p55kw×8p55kw×VFP
اتصل الآن
Compared with wet dust removal, dry dust removal has more efficiency on dust removal, does not use water, and is not affected by roadway slope, etc.
اتصل الآن
EBZ220B cantilever road header is mainly used for the tunneling of the fully mechanized coal mine face, and mainly suitable for the construction of thin seam small section coal and half-coal rock roadway tunneling. The whole machine has the following characteristics:Technical features:1. The height of the whole machine is low, which can adapt to thin seam half-coalrock roadway tunneling. 2. lt adopts two-speed cutting, with large torque at low speed, fast speed, andhigh effciency of cutting; lt has good cutting stability and strong cutting ability.3.
اتصل الآن
Rear Axle Accessories In Dump Trucks LC300 Half Shaft W2403082F91A1. Best dump truck rear axle replacement parts 2. Heavy duty dump truck rear axle components 3. Where to buy dump truck rear axle spare parts 4. Dump truck rear axle repair services 5. Dump truck rear axle maintenance tips
اتصل الآن
EBZ320 cantilever road header is a new type of extra heavy duty road header newly developed  mainly used for rock roadway tunneling.  Many technologies of this machine are new leading and innovative technologies at home and abroad, representing the development trend of road headers in China.  The machine is suitable for tunneling of coal mines with various types of floors, and can also be used for tunnel construction of railways, highways, and hydraulic engineering.Technical features:1.The machine adopts a fish-ridge split type transport mechanism with a high-efficiency in front
اتصل الآن
Technical features1. The whole machine is compact in structure, reasonable in arrangement, adjustable in height and width, and has strong adaptability to coal seam and roadway;2. The structure of the crusher adopts double protection of shear pins and speed sensors, which is safe and reliable; The crushing block degree can be adjusted; The optimized arrangement of cutting pick improves the crushing capacity and reduces the specific energy consumption; Cutting pick adopts hardening treatment technology to prolong the service life;3.
اتصل الآن
Tail Lights LG9704810002Right LG9704810001Left Combination Taillights HOWO Light Truck Accessories Best Tail Lights for Cars Tail Lights for Trucks LED Tail Lights Tail Lights Replacement Guide Tail Lights Repair TipsBUMPER (International Black | Middle Body) LG1612240002&171 HOWOBUMPER (International Gold) LG1617240005&184 HOWO G5XBumper (Haoluo White | High end Wide Body) LG1613240202&107 HaowoBumper (Haoluo White | Wide Body) LG1613241001&107 HaowoBumper (Haoluo White | Wide Body) LG1613240002&107 HaowoBumper (Haoluo White | Middle Body) LG1612240002&
اتصل الآن
EBH315Q Road Header:This model is an extra heavy duty rock roadway road header supported by the key project of China's 11th Five-Year Plan. Many of its technologies are new leading and innovative technologies at home and abroad, representing the development trend of road headers in China.The economical cutting hardness of this machine is f ≤ 10, locally f ≤ 12. lt is suitable for tunneling of various types of floor, half-coal rock and rock roadways, as well as railway, highway, hydraulic engineering and other tunnel construction.Technical features1.
اتصل الآن
Technical features:1. A moving step of the machine is 2 m or 1.5 m. By adjusting the number of rigid frames, the effective feeding distance between the machine and the belt reversed loader can be adjusted, so as to meet the requirement of one-day footage without belt, reduce labor intensity, and achieve rapid self-movement.2.
اتصل الآن
Bolter-miner is a newly developed multifunctional road header .Many technologies of this machine belong to the new leading and innovative technologies at home al and abroad, which represent the development trend of bolter-miners in China.
اتصل الآن
Heavy Duty Truck Parts Gas Pipe Quick ConnectYN33CRD-11008-1-2 Quick coupling joint/HA110248WG9725541970 exhaust pipeWG9925546580 Exhaust pipe with insulation layer addedWG9725542024 EVB exhaust pipe assembly (96 machines, EGR machines)WG9725542034 EVB exhaust pipe assembly (96C machine, EGR machine)WG9725542037 EVB cast exhaust pipe (69, 47, 95C machines)WG9725542039 EVB cast exhaust pipe (62, 87, 92, 93 machines)WG9725542041 EVB exhaust pipe assembly (69, 47, 95C machines)WG9725542042 EVB exhaust pipe assembly (62, 87, 92, 93 machines)WG9725542064 exhaust pipe (Section 3)WG9725542065 exhaust
اتصل الآن
VFG SERIES SINGLE STATION PRECISION  HEAVY WARM FORGING MACHINEparameterUnitVFG-400VFG-600VFG-800VFG-1000VFG-1300VFG-1600AbilityTons400600800100013001600Slider strokemm250250300300300300Slide Adjustmentmm606060606060Number of tripsSpm605050404040Maximum clamping heightmm600600700800800850Slider bottom panelmm900x750900x750900x8001200x9501250x10601400x1200Table panelmm900x900900x9001120x9801240x12001250x12501400x1300Main motorKw×p455575110110132Loading and jacking capacity-strokeTons-mm6x306x306x306x3010x3010x30Feeding and jacking capacity-strokeTons-mm10x5010x5010x5020x5020x5020x50
اتصل الآن
JW31 SERIES HIGH-PERFORMANCE WIDE TABLE CLOSED  SINGLE POINT PRESS (LONGITUDINAL CRANKSHAFT)Machine typeJW31-200JW31-250JW31-315JW31-400JW31-500JW31-630JW31-800CapacityTons200250315400500630800Stroke Lengthmm200220220250250250250Stroke Per MinuteSPM35~5520~3520~3520~3015~2515~2512~18Die height(S. D. A.
اتصل الآن
Dongfeng Accessory Steering GearWG9925476211 steering machine oil pressure steel pipe assemblyAZ9925470170 steering control device assembly (high floor, steering wheel raised by 20)AZ9925471090 steering shaft with column assembly (high floor, steering gear raised by 20, new column steering angle sensor rotation angle)LG9716471015 steering gear padWG9925476204 steering gear oil return steel pipe assemblyWG9925476205 steering machine oil pressure steel pipe assemblyWG9925476206 steering machine oil pressure steel pipe assemblyTZ9V3747150001 steel pipe assembly (pump steering gear)WG9325475021 Do
اتصل الآن
“Drill when in doubt, frst drill and then tunnel”. EBZ220T cantilever road  header is designed for the unknown geological conditions or the existence of dangerous sources (water, gas, etc.) in the mining process of coal mines. lt is a kind of all-in-one digging machine that integrates the functions of tunneling and advanced drilling construction. The drilling machine carried bythis machine can effectively complete the advanced drilling constructiorwithin a certain range of the full mechanized mining face.Technical features:1.
اتصل الآن
Technical features1.This machine adopts the constant power two-speed cutting technology for thefrst time, can be easily switched between high and low speeds and has a highcutting efficiency;2. The hydraulic system adopts constant power variable pump with load sensitivitycontrol and proportional multi-way directional valve and other newcomponents, greatly improving the efficiency of the hydraulic system;3. For the first time, the working pressure of China's road headers has beenincreased from 16 MPa to 23 MPa, and this machine can operate reliably.
اتصل الآن
Explosion-proof Man-riding Vehicle Technical Parameters:S/NItemTechnical indicator1Maximum capacity (person, including driver)122Complete vehicle kerb mas (kg)69003Overall dimensions of complete vehicle (mm)4880 X 1600 X  20504Minimum ground elearance (mm)1705Tuming radius (m)3.56Maximum speed (km/h)147Macimum gradeability (°)14 longitudinally and 7.5°transvenely8Rated power/rotation speed (kw/rpm)65/2200Explosion-proof Man-riding Vehicle Technical Features:1.The vehicle body is compact, suitable for moving in narrow roadway;2.
اتصل الآن
CMM Series Mobile Bolter Technical features:1.Multiple independent drill arms operating in parallel for efficientroof and side wall support;2.Flexibly adjustable drill arm orientation to meet the diversifiedrequirements for drill arm numbers and spacing;3.Highly reliable crawler traveling mechanism with good adaptabilityto the roadway floor;4. Cable winding device for automatic cable retracting and layingwhen the truck is moving;5. Standard dry drilling dust collection device to purify the workingface environment and ensure personnel health.
اتصل الآن
Relate News
Today, our company's five seater special explosion-proof four-wheel drive pickup truck is about to be shipped.This pickup truck with special performance is about to embark on a new journey, bringing unprecedented safety and excellent performance to customers.The spacious five seat layout inside this pickup truck not only provides a comfortable riding experience, but also meets the needs of multi person travel.This shipment is an important milestone in the company's development.
This is not only an exchange, but also an important opportunity to promote cooperation and friendship between both sides. We demonstrate our company's strength and advantages to foreign friends with a professional attitude and enthusiastic service. We look forward to this visit opening a new chapter of cooperation and contributing to the development of the company.
At the loading and shipping site, the neatly stacked goods reflect our professionalism and dedication. Thank you to every customer for their trust, let's witness this wonderful moment together!
Frolan International Trade (Shandong) Co., Ltd Explosion-proof sprinkler trial production success, on time delivery.We have been forging ahead with excellent quality and endless service!
Our foreign trade department has conducted in-depth and detailed product introductions with our Russian partners. The staff of the Ministry of Foreign Trade comprehensively introduced our company's products to our Russian partners through professional explanations and demonstrations, enabling them to have a deeper understanding and understanding of the products
On July 19, 2024, a significant event took place at our company. We successfully loaded and shipped the goods to the designated site.This achievement is the result of the collective efforts and seamless coordination of various departments within our organization. The production team worked tirelessly to ensure the goods were manufactured to the highest standards and completed on schedule.
Through the unremitting efforts of all employees in the company, our products have been fully packaged and are about to embark on the journey to Haba!In the past period, from research and development to production, every link has been the result of the team's wisdom and sweat. We carefully select materials and strictly control quality, only to provide customers with the highest quality products.Now, this batch of products carrying our expectations is about to be sent to Haba, which is not only an important step in our business expansion, but also a fulfillment of our market commitment.
Today, under the careful organization and arrangement of our company, after a series of tense and orderly operations, we finally successfully completed all the loading and shipping work today.
On May 29, 2024, this seemingly ordinary yet significant day, with the careful organization and comprehensive arrangements of all staff in our company, we went through a series of closely connected, tense, orderly, and interconnected work processes. Finally, we were relieved and successfully completed all the extremely important loading and unloading work related to the human vehicle chassis today.
At present, our company has entered the peak delivery period. All employees are making every effort to ensure that every batch of goods can be shipped smoothly.We uphold a rigorous attitude and professional spirit, strictly controlling every aspect and striving to provide customers with the highest quality service experience.
x

تم الإرسال بنجاح

سنتواصل معك بأقرب وقت ممكن

يغلق